string(910) " SELECT Projects.*, ProjectConditions.ConditionName, ProjectCategories.CategoryName, GROUP_CONCAT(DISTINCT Services.ServiceName SEPARATOR ', ') ServiceNames FROM Projects LEFT OUTER JOIN ProjectConditions ON Projects.ProjectCondition = ProjectConditions.ConditionID LEFT OUTER JOIN ProjectCategories ON Projects.CategoryID = ProjectCategories.CategoryID LEFT OUTER JOIN ProjectsToServices ON Projects.ProjectID=ProjectsToServices.ProjectID LEFT OUTER JOIN Services subServices ON ProjectsToServices.ServiceID=subServices.ServiceID LEFT OUTER JOIN Services ON (subServices.SubserviceTo=Services.ServiceID) OR (subServices.ServiceID=Services.ServiceID AND subServices.SubserviceTo IS NULL) WHERE Projects.ProjectSlug = 'CEI-of-ITS-for-SR-55-US-19-from-54th-Avenue-South-to-44th-Avenue-' " CEI of ITS for SR 55 (US 19) from 54th Avenue South to 44th Avenue | Genesis CEI Services

CEI of ITS for SR 55 (US 19) from 54th Avenue South to 44th Avenue


Notice: Undefined property via __get(): imgPrimary in /usr/local/apache2/sites/w2016.genesiscei.com/views/projects/details.ctp on line 5 in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 926
> CEI of ITS for SR 55 (US 19) from 54th Avenue South to 44th Avenue

CEI of ITS for SR 55 (US 19) from 54th Avenue South to 44th Avenue


Notice: Undefined property via __get(): imgPrimary in /usr/local/apache2/sites/w2016.genesiscei.com/views/projects/details.ctp on line 65 in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 926

Notice: Trying to get property 'url_rel' of non-object in /usr/local/apache2/sites/w2016.genesiscei.com/views/projects/details.ctp on line 65

Client: FDOT District 7
Location: Pinellas County, FL
Size:  
Service: Genesis CEI Services

Highlights:
Contact Staff: Christy Peeples
 

The improvements consist of the installation of dynamic message signs (DMS), closed circuit television (CCTV) cameras, connections to existing traffic signal controller cabinets and fiber optic cable throughout the project limits of SR 55 (US 19). US 19 is an urban other principle arterial active on the state highway system in Pinellas County. The system will splice into existing fiber optic cables on US 19 to the north and to the south at 5th Avenue North. A connection will be made from 5th Avenue to the City of St. Petersburg Traffic Control Center at 1744 9th Avenue North through City-owned property.  

Original Construction Budget: $1,992,239.90

Final Construction Amount: $1,975.125.88

 

Original Contract Time: 260 days

Final Contract Time: 305 days                     

Allowable Days: 305 days (last day 9/3/2015)

www.GenesisGroup.com

CEI of ITS for SR 55 (US 19) from 54th Avenue South to 44th Avenue


Pinellas County, FL

Client:

FDOT District 7

Location:

Pinellas County, FL

Size:

 

Service

Genesis CEI Services

Highlights:

Intelligent Transportation Systems (ITS)

Contact Staff:

Christy Peeples

CEI of ITS for SR 55 (US 19) from 54th Avenue South to 44th Avenue


Notice: Undefined property via __get(): imgPrimary in /usr/local/apache2/sites/w2016.genesiscei.com/views/projects/details.ctp on line 258 in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 926

Notice: Trying to get property 'url_rel' of non-object in /usr/local/apache2/sites/w2016.genesiscei.com/views/projects/details.ctp on line 258

The improvements consist of the installation of dynamic message signs (DMS), closed circuit television (CCTV) cameras, connections to existing traffic signal controller cabinets and fiber optic cable throughout the project limits of SR 55 (US 19). US 19 is an urban other principle arterial active on the state highway system in Pinellas County. The system will splice into existing fiber optic cables on US 19 to the north and to the south at 5th Avenue North. A connection will be made from 5th Avenue to the City of St. Petersburg Traffic Control Center at 1744 9th Avenue North through City-owned property.  

Original Construction Budget: $1,992,239.90

Final Construction Amount: $1,975.125.88

 

Original Contract Time: 260 days

Final Contract Time: 305 days                     

Allowable Days: 305 days (last day 9/3/2015)