string(873) " SELECT Projects.*, ProjectConditions.ConditionName, ProjectCategories.CategoryName, GROUP_CONCAT(DISTINCT Services.ServiceName SEPARATOR ', ') ServiceNames FROM Projects LEFT OUTER JOIN ProjectConditions ON Projects.ProjectCondition = ProjectConditions.ConditionID LEFT OUTER JOIN ProjectCategories ON Projects.CategoryID = ProjectCategories.CategoryID LEFT OUTER JOIN ProjectsToServices ON Projects.ProjectID=ProjectsToServices.ProjectID LEFT OUTER JOIN Services subServices ON ProjectsToServices.ServiceID=subServices.ServiceID LEFT OUTER JOIN Services ON (subServices.SubserviceTo=Services.ServiceID) OR (subServices.ServiceID=Services.ServiceID AND subServices.SubserviceTo IS NULL) WHERE Projects.ProjectSlug = 'CR-183-North-Kidd-Road-SCRAP' " CR 183 North (Kidd Road) SCRAP | Genesis CEI Services

CR 183 North (Kidd Road) SCRAP

> CR 183 North (Kidd Road) SCRAP

CR 183 North (Kidd Road) SCRAP

CR 183 North (Kidd Road) SCRAP

Client: Walton County Board of County Commissioners
Location: Walton County, FL
Size: Length: 7.1-miles
Construction Cost: $3.3 million
Service: Genesis CEI Services


Warning: count(): Parameter must be an array or an object that implements Countable in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 851

Notice: Undefined variable: res in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 857
Contact Staff: Doug Pritchard
 

The 7.1-mile, over $3.3-million CR 183 North (Kidd Road) SCRAP (Small County Road Assistance Project) Improvement project includes roadway overlay construction from Highway 90 to the Walton County/Holmes County line. The proposed improvements include widening of the existing road from 20 feet to 24 feet, constructing sodded swales, asphalt leveling course, signage, striping, and other safety and drainage improvements. All driveways, culverts, and mitered end section will be replaced.

The project began in August of 2017 and the expected completion is Summer 2018.

www.GenesisGroup.com

CR 183 North (Kidd Road) SCRAP


Walton County, FL

Client:

Walton County Board of County Commissioners

Location:

Walton County, FL

Size:

Length: 7.1-miles
Construction Cost: $3.3 million


Warning: count(): Parameter must be an array or an object that implements Countable in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 851

Notice: Undefined variable: res in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 857

Contact Staff:

Doug Pritchard

CR 183 North (Kidd Road) SCRAP

The 7.1-mile, over $3.3-million CR 183 North (Kidd Road) SCRAP (Small County Road Assistance Project) Improvement project includes roadway overlay construction from Highway 90 to the Walton County/Holmes County line. The proposed improvements include widening of the existing road from 20 feet to 24 feet, constructing sodded swales, asphalt leveling course, signage, striping, and other safety and drainage improvements. All driveways, culverts, and mitered end section will be replaced.

The project began in August of 2017 and the expected completion is Summer 2018.