string(863) " SELECT Projects.*, ProjectConditions.ConditionName, ProjectCategories.CategoryName, GROUP_CONCAT(DISTINCT Services.ServiceName SEPARATOR ', ') ServiceNames FROM Projects LEFT OUTER JOIN ProjectConditions ON Projects.ProjectCondition = ProjectConditions.ConditionID LEFT OUTER JOIN ProjectCategories ON Projects.CategoryID = ProjectCategories.CategoryID LEFT OUTER JOIN ProjectsToServices ON Projects.ProjectID=ProjectsToServices.ProjectID LEFT OUTER JOIN Services subServices ON ProjectsToServices.ServiceID=subServices.ServiceID LEFT OUTER JOIN Services ON (subServices.SubserviceTo=Services.ServiceID) OR (subServices.ServiceID=Services.ServiceID AND subServices.SubserviceTo IS NULL) WHERE Projects.ProjectSlug = 'Gateway-Expressway' " Gateway Expressway | Genesis CEI Services

Gateway Expressway

> Gateway Expressway

Gateway Expressway

Gateway Expressway

Client: Cardno, Inc., FDOT District 7
Location: Pinellas County, FL
Size: Length: 12 miles Construction Cost: $544 million
Service: Genesis CEI Services


Warning: count(): Parameter must be an array or an object that implements Countable in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 851

Notice: Undefined variable: res in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 857
Contact Staff: Marty Sanchez, P.E.
 

Genesis CEI is a major subconsultant on the 1,300-day Gateway Expressway design-build project in Pinellas County. It will take over $544 million to construct over 12 miles of bridges, flyovers, and roadways. This project is complex and includes several components and upgrades to the existing roadway system:

  • SR 690 will be a new elevated 4-lane expressway connection from US 19 to west of I-275.
  • SR 686A will be a new elevated 4-lane elevated expressway from the Bayside Bridge to just west of I-275 that will merge with SR 690 via flyover structures.
  • SR 686 (Roosevelt Boulevard) will be reconstructed from the Bayside Bridge to SR 688 (Ulmerton Road) as a 2-lane road with new access to the St. Pete-Clearwater International Airport.
  • CR 296 (118th Avenue) will reconstructed from US 19 to 31st Court North. I-275 will be reconstructed from South of Gandy Boulevard to North of 4th Street North.  

All elevated roadways will be managed toll lanes. The Gateway Expressway project is the largest project ever undertaken by FDOT District 7. When completed, this project will result in a significant positive impact to the region.

www.GenesisGroup.com

Gateway Expressway


Pinellas County, FL

Client:

Cardno, Inc., FDOT District 7

Location:

Pinellas County, FL

Size:

Length: 12 miles Construction Cost: $544 million


Warning: count(): Parameter must be an array or an object that implements Countable in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 851

Notice: Undefined variable: res in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 857

Contact Staff:

Marty Sanchez, P.E.

Gateway Expressway

Genesis CEI is a major subconsultant on the 1,300-day Gateway Expressway design-build project in Pinellas County. It will take over $544 million to construct over 12 miles of bridges, flyovers, and roadways. This project is complex and includes several components and upgrades to the existing roadway system:

  • SR 690 will be a new elevated 4-lane expressway connection from US 19 to west of I-275.
  • SR 686A will be a new elevated 4-lane elevated expressway from the Bayside Bridge to just west of I-275 that will merge with SR 690 via flyover structures.
  • SR 686 (Roosevelt Boulevard) will be reconstructed from the Bayside Bridge to SR 688 (Ulmerton Road) as a 2-lane road with new access to the St. Pete-Clearwater International Airport.
  • CR 296 (118th Avenue) will reconstructed from US 19 to 31st Court North. I-275 will be reconstructed from South of Gandy Boulevard to North of 4th Street North.  

All elevated roadways will be managed toll lanes. The Gateway Expressway project is the largest project ever undertaken by FDOT District 7. When completed, this project will result in a significant positive impact to the region.