string(876) " SELECT Projects.*, ProjectConditions.ConditionName, ProjectCategories.CategoryName, GROUP_CONCAT(DISTINCT Services.ServiceName SEPARATOR ', ') ServiceNames FROM Projects LEFT OUTER JOIN ProjectConditions ON Projects.ProjectCondition = ProjectConditions.ConditionID LEFT OUTER JOIN ProjectCategories ON Projects.CategoryID = ProjectCategories.CategoryID LEFT OUTER JOIN ProjectsToServices ON Projects.ProjectID=ProjectsToServices.ProjectID LEFT OUTER JOIN Services subServices ON ProjectsToServices.ServiceID=subServices.ServiceID LEFT OUTER JOIN Services ON (subServices.SubserviceTo=Services.ServiceID) OR (subServices.ServiceID=Services.ServiceID AND subServices.SubserviceTo IS NULL) WHERE Projects.ProjectSlug = 'I-75-Northbound-On-Ramps-at-I-4' " I-75 Northbound On-Ramps at I-4 | Genesis CEI Services

I-75 Northbound On-Ramps at I-4

> I-75 Northbound On-Ramps at I-4

I-75 Northbound On-Ramps at I-4

I-75 Northbound On-Ramps at I-4

Client: WSP, FDOT District 7
Location: Hillsborough County, FL
Size: Construction Cost: $17.8 million
Service: Genesis CEI Services


Warning: count(): Parameter must be an array or an object that implements Countable in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 851

Notice: Undefined variable: res in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 857
Contact Staff: Bradley (Brad) F. Post, P.E.
 

Genesis CEI is teaming with WSP for this initially 434-day, $17.8 million project in Hillsborough County. The project relocates and combines the two northbound on-ramps to improve traffic flow at the interchange by eliminating the short merge distances. The project will also add a fourth lane to the mainline within the project limits to provide ample distance for traffic to enter the three-lane section of I-75. Work on the project includes concrete and asphalt pavement, construction of four new bridges, eight MSE walls, an extensive amount of subsoil excavation, signing, pavement markings, and roadway lighting. The expected completion for this project is Spring 2018.

www.GenesisGroup.com

I-75 Northbound On-Ramps at I-4


Hillsborough County, FL

Client:

WSP, FDOT District 7

Location:

Hillsborough County, FL

Size:

Construction Cost: $17.8 million


Warning: count(): Parameter must be an array or an object that implements Countable in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 851

Notice: Undefined variable: res in /usr/local/apache2/sites/w2016.genesisgroup.com/lib/libobj.php on line 857

I-75 Northbound On-Ramps at I-4

Genesis CEI is teaming with WSP for this initially 434-day, $17.8 million project in Hillsborough County. The project relocates and combines the two northbound on-ramps to improve traffic flow at the interchange by eliminating the short merge distances. The project will also add a fourth lane to the mainline within the project limits to provide ample distance for traffic to enter the three-lane section of I-75. Work on the project includes concrete and asphalt pavement, construction of four new bridges, eight MSE walls, an extensive amount of subsoil excavation, signing, pavement markings, and roadway lighting. The expected completion for this project is Spring 2018.