string(884) " SELECT Projects.*, ProjectConditions.ConditionName, ProjectCategories.CategoryName, GROUP_CONCAT(DISTINCT Services.ServiceName SEPARATOR ', ') ServiceNames FROM Projects LEFT OUTER JOIN ProjectConditions ON Projects.ProjectCondition = ProjectConditions.ConditionID LEFT OUTER JOIN ProjectCategories ON Projects.CategoryID = ProjectCategories.CategoryID LEFT OUTER JOIN ProjectsToServices ON Projects.ProjectID=ProjectsToServices.ProjectID LEFT OUTER JOIN Services subServices ON ProjectsToServices.ServiceID=subServices.ServiceID LEFT OUTER JOIN Services ON (subServices.SubserviceTo=Services.ServiceID) OR (subServices.ServiceID=Services.ServiceID AND subServices.SubserviceTo IS NULL) WHERE Projects.ProjectSlug = 'SR-30-US-98-from-Airport-Road-to-CR-30A' " SR 30 (US-98) from Airport Road to CR 30A | Genesis CEI Services

SR 30 (US-98) from Airport Road to CR 30A

> SR 30 (US-98) from Airport Road to CR 30A

SR 30 (US-98) from Airport Road to CR 30A

SR 30 (US-98) from Airport Road to CR 30A

Client: FDOT
Location: Okaloosa and Walton Counties, FL
Size: Length: 1.8 miles |  Construction Cost: $14.2 million
Service: Genesis CEI Services

Highlights:
Contact Staff: William Klepac, P.E.
 

SR 30 (US 98) from West of Airport Road to CR 30A in Okaloosa/Walton County was a $14.2 million construction project. This Genesis CEI project included milling and paving of urban and rural multi-lane highway in Okaloosa and Walton Counties, along with road widening for construction of bicycle key-hole lanes, LED traffic signal upgrades, and sign installation and striping. This was a night work project with high-visibility and public relations efforts.

This project has been awarded the 2009 Quality in Construction Award for Excellence in Asphalt Pavements by the National Asphalt Pavement Association (NAPA), and the 2009 Statewide Resurfacing Urban Award for Excellence in Paving by the Asphalt Contractors Association of Florida (ACAF).

www.GenesisGroup.com

SR 30 (US-98) from Airport Road to CR 30A


Okaloosa and Walton Counties, FL

Client:

FDOT

Location:

Okaloosa and Walton Counties, FL

Size:

Length: 1.8 miles |  Construction Cost: $14.2 million

Service

Genesis CEI Services

Highlights:

Construction Engineering and Inspection
Signage and Striping

Contact Staff:

William Klepac, P.E.

SR 30 (US-98) from Airport Road to CR 30A

SR 30 (US 98) from West of Airport Road to CR 30A in Okaloosa/Walton County was a $14.2 million construction project. This Genesis CEI project included milling and paving of urban and rural multi-lane highway in Okaloosa and Walton Counties, along with road widening for construction of bicycle key-hole lanes, LED traffic signal upgrades, and sign installation and striping. This was a night work project with high-visibility and public relations efforts.

This project has been awarded the 2009 Quality in Construction Award for Excellence in Asphalt Pavements by the National Asphalt Pavement Association (NAPA), and the 2009 Statewide Resurfacing Urban Award for Excellence in Paving by the Asphalt Contractors Association of Florida (ACAF).