string(850) " SELECT Projects.*, ProjectConditions.ConditionName, ProjectCategories.CategoryName, GROUP_CONCAT(DISTINCT Services.ServiceName SEPARATOR ', ') ServiceNames FROM Projects LEFT OUTER JOIN ProjectConditions ON Projects.ProjectCondition = ProjectConditions.ConditionID LEFT OUTER JOIN ProjectCategories ON Projects.CategoryID = ProjectCategories.CategoryID LEFT OUTER JOIN ProjectsToServices ON Projects.ProjectID=ProjectsToServices.ProjectID LEFT OUTER JOIN Services subServices ON ProjectsToServices.ServiceID=subServices.ServiceID LEFT OUTER JOIN Services ON (subServices.SubserviceTo=Services.ServiceID) OR (subServices.ServiceID=Services.ServiceID AND subServices.SubserviceTo IS NULL) WHERE Projects.ProjectSlug = 'SR-54' " SR 54 | Genesis CEI Services

SR 54

> SR 54

SR 54

SR 54

Client: FDOT
Location: Pasco County, FL
Size: Length: 2.7 miles Construction Cost: $40 million
Service: Genesis CEI Services

Highlights:
Contact Staff: Tony Harvey
 

SR 54 involved the multi-lane reconstruction of a two-lane undivided highway to a six-lane divided rural highway. Services included major earthwork, demucking, box culvert, storm drainage systems, storm pond construction, floodplain compensation/wetland mitigation sites, earthwork preload site, limerock base, asphalt paving, highway lighting, signing, and pavement markings.

This project was awarded the 2006 Florida's Best in Construction Award for Utility Coordination/Damage Prevention by the Florida Transportation Builders Association, Inc. (FTBA).

www.GenesisGroup.com

SR 54


Pasco County, FL

Client:

FDOT

Location:

Pasco County, FL

Size:

Length: 2.7 miles Construction Cost: $40 million

Service

Genesis CEI Services

Highlights:

Construction Engineering and Inspection
Signage and Striping
Utility Coordination

Contact Staff:

Tony Harvey

SR 54

SR 54 involved the multi-lane reconstruction of a two-lane undivided highway to a six-lane divided rural highway. Services included major earthwork, demucking, box culvert, storm drainage systems, storm pond construction, floodplain compensation/wetland mitigation sites, earthwork preload site, limerock base, asphalt paving, highway lighting, signing, and pavement markings.

This project was awarded the 2006 Florida's Best in Construction Award for Utility Coordination/Damage Prevention by the Florida Transportation Builders Association, Inc. (FTBA).